- Seawall Apron & Intake Pipe Area
- Ash Pond Area
- Main Gate & Township Area
Soil Improvement in Sea Apron and Ash Pond Area


Prefabricated Vertical Drain (PVD) driving Work in Ash Pond Area


Prefabricated Horizontal Drain (PHD) laying Work in Ash Pond Area.


Boring Work by Coring Machine for Observation Well Installation.


Pumping Well in Gravel ditch for surcharge and dewatering.


Settlement Plate Installation work for measurement of Soil Settlement.


Piezometer and Inclinometer Installation work in Ash Pond Partition wall Area.


Monitoring Work: Take Reading of Observation Well and Settlement Plate.